Home > Products > Overhead Crane > Double Girder Overhead Crane


QZ General bridge crane

QZ General bridge crane

Overview:

QZ General bridge crane, crane, crane,(grab crane) suitable for metallurgy, cement, chemical and other enterprises in the warehouse and workshop in the indoor or open air and fixed span engaged in ore, limestone, mineral powder, coke, coal sand and other loose particles handling work.

Features

Welding process 


1) The main steel structure (main beam, end beam) is made of Q235-B, and the materials used have material reports and corresponding certificates. 


2) The manufacturing, welding and inspection of steel structure shall be carried out according to national standards. Important force butt weld adopts double-sided groove welding process, and carries out appearance inspection and non-destructive testing according to regulations, all welders hold the corresponding grade certificate. 


3) All crane main beams adopt the whole plate without butt process, cancel the butt weld of the main beam steel plate, and eliminate the hidden danger of butt welding of the steel plate. (Steel plate butt welding is the most important welding, and it is the most hidden danger of quality) 


4) All plates are automatically cut by CNC cutting machine, and the arch of the main beam is preset to avoid the problem of the arch of the traditional fire-baked main beam. 


5) The surface of the steel is shot peening, and the surface roughness reaches the Sa2.5 level in GB8923 "Steel Surface Treatment Registration and Rust removal Grade before painting", which improves the paint adhesion, does not remove the paint, and ensures the long-term beauty of the single-beam crane 


6) The main beam longitudinal waist weld adopts the domestic advanced automatic special machine ambush welding, forming beautiful, to ensure the welding quality. 


7) The truck beam is made of rectangular tube as a whole, no splicing, no weld, beautiful appearance, strong and durable. 


8) All wheel installation adopts boring type installation to avoid wheel tread not in the same horizontal plane and improve wheel operation accuracy.


Specification

The crane is composed of five parts: box bridge, truck running mechanism, car, grab bucket and electrical equipment, all of which are operated in the control room. 


The fetching device is a four-rope grab bucket with double drum, which is simple in structure and reliable in operation. The grab can be opened and closed at any height, and the grab with teeth should be selected when the grasping material particles are greater than 200mm.


Henan Sinoko Cranes Co,.Ltd. All Rights Reserved. Sitemap